1800 555 900
Project Gallery Project Gallery

Access Entry have delivered solutions and products to a variety of applications and projects over the past 15 years. These include, but are not restricted to, Hospitals, Aged Care, Shopping Centres, Education facilities and local supermarkets, news agencies and pharmacies.

Access Entry has the experience, technical expertise, and a demonstrated track record, to fulfil any project irrespective of size.

When it comes to automatic door solutions you can trust the team at Access Entry.

Our projects can be seen across some of Australia’s most recognisable buildings.

AUTOMATIC DOOR SOLUTIONS GET IN TOUCH 1800 555 900

Project Name: Bendigo Hospital, Bendigo


Bendigo Hospital Redevelopment

Completed: 2017



Project Summary:


In association with Access Hardware Victoria, approximately 240 swing door operators and 40 plus sliding door entries, have been supplied and installed on this project. This highlights our ability and capacity to handle the largest of projects. In addition to this, Access Entry’s service division are providing ongoing service /maintenance support to the Hospital through its service provider.


Project Name: 120 Collins St, Melbourne


121 Collins St Melbourne

Completed: 2014



Project Summary:


Supply of SZL100 units to front and rear airlock entries to building for hi traffic application and usage of frameless glass doors. All units were connected to BMS and FRP systems.


Project Name: 233 Collins St, Melbourne


233 Collins St Melbourne

Completed: 2010



Project Summary:


This project involved the removal of existing aged auto door sliders and replacement with Access SZL100 units throughout the building.


Project Name: 440 Collins St, Melbourne


440 Collins St Melbourne

Completed: 2010



Project Summary:


Complete refurbishment of entry to building using Access SZL100 units fitted with 15mm toughened frameless glass doors.


Project Name: 500 Bourke St, Melbourne


500 Bourke St Melbourne

Completed: 2010



Project Summary:


We have supplied our SZL100 automatic door operators complete with electric locking. The building tenants had a requirement to be able to interface with their security system and Access Entry were happy to oblige.


Project Name: 485 Latrobe St, Melbourne


485 Latrobe St Melbourne

Completed: 2010



Project Summary:


Supply of both front and rear entry automatic door operators to airlocks. Work was carried out with minimal disruption to the day to day operation of the building. A total of 8 Access SZL100 locking units were installed.


Project Name: 330 Collins St, Melbourne


330 Collins St Melbourne

Completed: 2010



Project Summary:


Building entrance up-grade: including supply of Manusa “Low Profile” Locking units fitted with 15mm toughed glass doors externally, and Access SZL100 units internally.


Project Name: 459 Collins St, Melbourne


459 Collins St Melbourne

Completed: 2010



Project Summary:


Main Entry airlocks and one internal unit were supplied during refurbishments, Access SZL100 units Supplied.


Project Name: 500 Collins St, Melbourne


500 Collins St Melbourne

Completed: 2010



Project Summary:


Upgrade project, Access SZL100 units throughout this project were supplied to internal entrances and connected to Buildings security systems.


Project Name: Porsche, Melbourne


Porsche Australian Head Office

Completed: 2014



Project Summary:


Porsche H.O. - A variety of both Visio and Access SZL100 operators were supplied to accommodate specific traffic flow entries. All external units were connected to the existing security system.



Project Name: Shrine


Shrine of Remembrance

Completed: 2003



Project Summary:


Internal refurbishment of the Shrine is ongoing and Access SZL100 units have been included in these upgrades.


Project Name: Chadstone Toyota


Chadstone Toyota

Completed: 2013



Project Summary:


Toyota showroom at Chadstone included the supply of Access SZL100 units, with all external operators connected to the existing security system.